- Discovery
- Assessment
- Guidelines
- Calibration
- Qualification
- Production
- Quality control
- Acceptance
STAGE 01 / 08
Discovery
Understand objectives; Define data types
DELIVERY & QUALITY
Delivery & Quality
Agree acceptance criteria before production, then verify files, versions and review records at handover. Explore responsibilities, checks by data type and how to read a quality report.
QC-CAM-01
QC-CAM-01 / 120 sampled frames / GUIDE-1.2
01 / DELIVERY WORKFLOW
Each stage has a defined action and output. Review coverage, responsibilities and delivery cadence are agreed for the project.
STAGE 01 / 08
Understand objectives; Define data types
STAGE 02 / 08
Review data volume; Evaluate data quality
STAGE 03 / 08
Define processing rules; Break down data requirements
STAGE 04 / 08
Run a pilot batch; Align interpretations
STAGE 05 / 08
Screen specialists; Train and assess
STAGE 06 / 08
Plan production; Assign and schedule
STAGE 07 / 08
Layered quality checks; Sample and full reviews
STAGE 08 / 08
Prepare deliverables; Check against criteria
02 / QUALITY CONTROLS
Separate review responsibilities while linking results to the same guideline and data version. Use automated checks and human judgment for the questions each can answer.
Check completeness, classes and attributes against the guide. Record and address obvious issues first.
Cross-check ambiguous classes and boundary cases. Feed unclear definitions back into the guide.
Review the agreed scope and dimensions. Record issue location, type, severity and affected units.
Check files, versions, formats, sample scope and open issues before a delivery decision.
QUALITY BY DATA TYPE
Agree on review units, sampling and acceptance criteria before production. Image counts, audio duration, text entries and paired samples require different checks.
Class consistency, boundary accuracy, omissions, text accuracy and duplicate images.
View taskIdentity switches, broken tracks, event boundaries, timelines and clip completeness.
View taskTranscription accuracy, speaker consistency, time boundaries, clipping, silence and noise.
View taskEntity boundaries, label consistency, complete relations, encoding and duplicate content.
View taskPosition, dimensions, orientation, point classes and coordinate consistency.
View taskPair completeness, semantic consistency, timing, missing modalities and shared IDs.
View taskEach delivery states the data version, review scope, findings, rework and unresolved items. A review rate applies only to the stated units and sample.
03 / REVIEW REPORT
The following three road-vision and sensor batches illustrate initial, rework and current results. These rates describe the listed review units, not model accuracy or the status of unchecked data.
QC-CAM-01
114 / 120
Initial passes / checked units
6 / 6
Recheck passes / initial failures
120 / 120
(Initial + recheck passes) / checked units
Review result counts
Each unit is grouped by one primary issue and counted once. Current sample pass rate = (initial passes + recheck passes) / checked units.
Sample recheck completeAll 120 checked units currently pass. The remaining 480 frames are outside this result. Delivery still requires agreed acceptance.
Issue groups summarize scope and corrections. Detailed records link each unit to its location, guideline clause and revision.
| Primary issue | Affected units | Correction | Recheck result |
|---|---|---|---|
| Missing objects | 3 frames | Add objects and classes | 3 / 3 passed |
| Loose boundaries | 2 frames | Correct box boundaries | 2 / 2 passed |
| Occlusion inconsistency | 1 frame | Align the attribute to the guide | 1 / 1 passed |
Keep a reference chain for every correction so a reviewer can return to the same data unit. List unresolved issues separately and agree whether to rework, exclude or defer them.
Unit ID + issue location
CAM-018Issue type + guideline clause
ISSUE-006 / §4.2Change + data revision
r01 → r02Result + open issues
RECHECK-00604 / ACCEPTANCE & HANDOVER
A handover includes more than data files. Bring guidelines, versions, review scope and outstanding items into one manifest for verification, reuse and traceability.
Check batch IDs, file counts, valid units and exclusions.
Align task rules, class lists, revisions and export versions.
Check directories, fields, references and sample readability.
State the review scope, calculations, rechecks and open issues.
Record receipt, outstanding items and the agreed acceptance result.
PROJECT ARRANGEMENTS
These are proposed topics for project planning. The actual arrangements depend on the agreement and the operating environment.
Define project roles, accessible data, allowed actions and authorization periods.
Confirm provenance and permitted use; agree handling and masking of sensitive fields.
Agree transfer, retention, receipt checks and recorded disposition at project close.
QUESTIONS
Keep the open issues and affected scope visible. Agree further rework, exclusions or staged delivery. The LiDAR example on this page remains on hold.
Assess the guidelines, fields, checks and export formats, then validate them on a small batch. Confirm platform access and permissions separately.
Record the reason, applicable version and affected batches. Agree whether existing data needs rework and assess the impact before continuing. Keep review results tied to their guideline version.
START WITH THE ACCEPTANCE CRITERIA
Start with the data type, expected volume and an existing guideline to shape review criteria and batch delivery.